DC Clean Rivers’ Anacostia River Tunnel Holes Through. In January 2017, DC Water and its design-builder, Impregilio Healy Parsons (IHP), completed tunneling the 23-foot diameter by 12,700-foot-long Anacostia River Tunnel. Congratulations to DC Water and IHP! See the video here.
Anacostia River Tunnel Completed
- January 18, 2017
- Anacostia River Tunnel, DC Clean Rivers Project
- 0



