JCK Underground’s founders and key staff possess a wealth of practical experience. Some of this experience was developed on projects such as Narragansett Bay Commission Combined Sewer Overflow Project, Massachusetts Water Resources Authority tunnel projects, and the Boston’s Central Artery (I-93)/ Third Harbor Tunnel Project, prior to the founding of JCK Underground. This shared experience on major projects led to the development of strong inter-personal relationships, mutual understanding, and trust in each other’s skills. This synergy and seamless collaboration translates to our ability to deliver quality results time and time again.

Download the JCK Underground SOQ for more detailed information.

PERSONNEL / ROLE
PROJECT JJ RC JK MG GH RP MK
DC Clean Rivers Program, Washington, DC
(see description in Current Projects)
P/D P/D/C P/D C P C
Narragansett Bay Commission Combined Sewer Overflow Program, Providence, RI
  • Phase I – 3 mile, 26-feet dia. 200-feet deep storage and conveyance tunnel (shield TBM in rock), drill & blast-driven connecting adits, access and drop shafts, diversion structures, conveyance conduits, and a 50 MGD pump station.
D C P P
  • Phase II – 5 miles of 48- to 72-inch dia. near-surface interceptors driven using slurry MTBM’s, diversion structures, and deep connecting adits.
D C P
Massachusetts Water Resources Authority, Boston, MA
  • Boston Harbor Wastewater Treatment Project – 3 tunnels with 12- to 24-feet dia., 15 miles total length (double shield, main beam and single shield TBM’s in rock and soft ground)
C C C
  • Metrowest Water Supply Tunnel – 18 miles, 14-feet dia. (main beam and double shield rock TBM)
D C C
  • Braintree Weymouth Wastewater Tunnel – 3 miles, 13-feet dia. (main beam rock TBM)
D/G C
South Central Connecticut Regional Water Authority *
  • Tunnel No. 1 and Tunnel No. 2 (*locations confidential) inspection and rehabilitation recommendations
D
  • Tunnel No. 3 Redundancy Tunnel Feasibility study
D
Catskill Aqueduct Repair and Rehabilitation, Upstate NY
Program to repair lining / remove biofilm in 75 miles of tunnel
D
Richmond Transport Tunnel, San Francisco, CA, 2 miles of 14-foot diameter CSO storage and transport tunnell C C