Posts filed under: DC Clean Rivers Project

Best of the Best 2016 Project of the Year – Blue Plains Tunnel

DC Clean Rivers Project Blue Plains Tunnel wins ENR’s Best of the Best 2016 Project of the Year Award. Congratulations to DC Water and its Blue Plains Tunnel design-builder, Traylor Skanska Jay-Dee for winning this prestigious award, which considers over 700...
Continue Reading →

Anacostia River Tunnel Completed

DC Clean Rivers’ Anacostia River Tunnel Holes Through. In January 2017, DC Water and its design-builder, Impregilio Healy Parsons (IHP), completed tunneling the 23-foot diameter by 12,700-foot-long Anacostia River Tunnel. Congratulations to DC Water and IHP! See the video here....
Continue Reading →

Project of the Year, Mid-Atlantic – Blue Plains Tunnel

DC Clean Rivers Project Blue Plains Tunnel wins ENR’s Mid-Atlantic Project of the Year Award. Congratulations to DC Water and its Blue Plains Tunnel design-builder, Traylor Skanska Jay-Dee for yet another award. This is one of four major tunnels being...
Continue Reading →

Ryan Payne joins JCK Underground

Washington, DC, September 6, 2016: Ryan Payne, a geotechnical engineer with extensive experience in soft ground tunneling and deep excavations, joins JCK in Washington, DC. Since 2009, Ryan has been supporting the DC Water Clean Rivers (DCCR) Project in various...
Continue Reading →